The “Cas Tresorer – Manacor – Felanitx Primary Gas Transmission Pipeline” on the Island of Mallorca is 58,586 metres long in total, distributed as follows:
Cas Tresorer-Manacor section
45,005 metres Ø16″, which begins upon leaving the existing SANSON-01 Position of the San Juan de Dios – Cas Tresorer-Son Reus Gas Pipeline in Palma de Mallorca, and ends at the CASFEL-04 Position (in the municipality of Manacor).
Manacor-Felanitx section
13,591 meters Ø12″, as a continuation of the previous section, which begins upon leaving the CASFEL-04 Position (Manacor) and ends at the CASFEL-06 Position (municipality of Felanitx).
Main units
- 45,005 metres of 16″ diameter steel pipe
- 13,591 metres of 12″ diameter steel pipe
- 6 intermediate valve positions
- 4 scraper traps for inspection