Cas Tresorer-Manacor-Felanitx Gas Pipeline. Spain

Spain
  • 58,586 m of steel pipe
  • 6 intermediate valve positions
  • 4 scraper traps

The “Cas Tresorer – Manacor – Felanitx Primary Gas Transmission Pipeline” on the Island of Mallorca is 58,586 metres long in total, distributed as follows:

Cas Tresorer-Manacor section

45,005 metres Ø16″, which begins upon leaving the existing SANSON-01 Position of the San Juan de Dios – Cas Tresorer-Son Reus Gas Pipeline in Palma de Mallorca, and ends at the CASFEL-04 Position (in the municipality of Manacor).

Manacor-Felanitx section

13,591 meters Ø12″, as a continuation of the previous section, which begins upon leaving the CASFEL-04 Position (Manacor) and ends at the CASFEL-06 Position (municipality of Felanitx).

Main units

  • 45,005 metres of 16″ diameter steel pipe
  • 13,591 metres of 12″ diameter steel pipe
  • 6 intermediate valve positions
  • 4 scraper traps for inspection