We are backed by half a century of experience as a leading company in the Spanish energy sector, where we have built more than 2,600 km of medium and high-pressure transmission lines. Some of our completed projects in Spain are:
Completed projects
- Looping of the Arbos-Tivissa gas pipeline
- Moratalla-Mula Tivissa secondary transmission pipeline
- Cartagena-Puertollano distillates pipeline Sections III and IV. Albacete-Ciudad Real
- Gas pipeline branch to Besos. Barcelona
- Cas Tresorer-Manacor-Felanit’x gas pipeline. Balearic Islands
Ongoing projects
- Downstream piping for the client EXOLUM
- Looping of the Valencia-Alicante gas pipeline Section between positions 15.14 (Paterna) and 15.20 (Montesa) for the client ENAGAS